Drone survey and progress monitoring on construction projects in India. Earthwork volumes, dated progress records, as-built comparison against design, and measured evidence for valuation and claims, flown at intervals that match the reporting cycle.

Construction
Construction

Where we can use it

Construction survey differs from land survey in one respect that governs everything else: the site changes. A single capture of a construction site is of limited use. The value is in a sequence of captures on the same control, so each one can be compared with the last and with the design model.

01

What that gives you

Earthwork quantities, cut and fill, against original ground level or against the previous capture. Progress against programme, recorded on a date rather than asserted in a meeting. As-built geometry compared with the design surface, which finds deviation while it is still cheap to correct. Stockpile volumes for material held on site. A dated visual record of the whole site that survives staff changes and supports a claim, or a defence against one.

02

Frequency matters more than resolution

Monthly capture on a two year project produces twenty four comparable datasets. Most clients over-specify the accuracy and under-specify the interval, then discover that the one month they needed a record is the month nobody flew. We would rather agree a schedule at the start and hold to it.

03

Control is the part that has to be right

Comparison between epochs only works if every epoch sits on the same control, in the same coordinate system, to the same vertical datum. Control on a live construction site gets built over, moved and destroyed, so it is established outside the works where it can be reoccupied, documented properly, and checked at each visit. A site flown on drifting control produces volume differences that cannot be told apart from real change.

04

What it does not do

It measures the visible surface. It does not measure inside a completed structure, under a slab, beneath a roof once it is on, or in a basement once it is covered. It does not establish quality, compliance or structural adequacy, and a progress record is not a certification. On a building project the useful window for aerial survey is widest during earthwork and substructure, and it narrows as the envelope closes.

Work is flown around the site activity. Cranes, dense working areas and personnel below govern when and where we can fly, and that is agreed with the site before mobilisation rather than negotiated on the day.

Deliverables

What you receive

Every output is delivered in your coordinate system, with projection metadata embedded.

  • OrthomosaicTIFFJPEG
  • 3D Point Cloud to CADLASLAZ
  • DTM, Digital Terrain ModelTIFF
  • Contour MappingDXFSHP
  • Flood Water VisualisationTIFFPDF
  • Stockpile CalculationPDFXLSX
  • Object MarkingDXFTIFF
  • Thermal OrthomosaicTIFFJPEG